Armor rod single support/ Helical Fittings/Preformed Armour Rods Manufacturing Process

ADSS Preformed Line Products manufacturer , Spiral Vibration Damper for ADSS, Anti-Corona Ring for ADSS, Suspension Assembly for ADSS, Tension Assembly for ADSS, Fiber optic Splice Closure for ADSS, Cross for Storing ADSS Cable, Downlead Clamp for ADSS Preformed Line Products for OPGW, Suspension Assembly for OPGW, Tension Assembly for OPGW, Vibration Damper for OPGW, Downlead Clamp for OPGW, Fiber Optic Splice Closure for OPGW, Cross for Storing OPGW Cable Preformed Line Products for Overhead Power Lines, Preformed Splice, Repair Rod,Armor Rod

Helical Fittings/Overhead Armor Rods Power Equipments supplier,PLP preformed line Products forming machines
armor rod,armour rod,aluminum conductor accessory rod armor manufacturer.  steel reinforced(ACSR, all-aluminum alloy conductors(AAAC) and aluminum clad steel conductor

Preformed Armor Rod Manufacturing Process 1. Preformed Armor Rod Shaping 1.1 Technical Requirements After shaping is completed, the bore diameter of the preformed armorrod meets the design requirement.The thread pitchis required to be uniform, and the pitch deviation is ±5mm.The deviation of the length reaches ±2%. 1.2 Process The selection of single armor rods, guide rollers and forming dies depends ondifferent production orders.Afterinsallation and trial runs are completed, we measure the bore diameter and thread pitch of the preformed armor rod,and thenadjust the angle of the extrusion head until the size of the armor rod meet the order requirements.Prior to mass production, wecarry out article inspection to ensure that the rods are in compliance with the order requirements and then record the tes results. 2. Preformed Armor Rod End Processing 2.1 fechnical Requirements Theendsof the preformedarmor rodshouldbe dean,fat and fee ofburs.Thishelps to prevent wiresor cables fom scratches during installation 2.2 Process The tol holderis kept0.5mmfrom the grinding whelTheheight of the tol holderis hesameasthe diametrof theamorrod tobe ground.Before grinding isconducted these twoends of the armorrodarearrangedinasraight line.Next theoperatorholsthe front part ofthe rod in isleft hand while imultaneousyholding the middle partof therodinhis ight hand,and thentherodisrn through the grinding process. 3. Preformed Armor Rod Coating 3.1 echncal Requirements In orderto achieve outstanding abrasionresistance,our preformed splices are coated with conductive grease.Both the innr and outer rods of thestrain clamp need to be coated wit silioncarbide.The iner rod isdesigned with a mesh size of up to0.18mm,and the outer rod comes with a meshsize of up to0.25mm.The coating should beflat uniform and free of bulges. 3.2 Process After the end processing is done,preformed armorrods arerequired to undergo cleaning,rod repair and reinforcement as wellas gluing and coating procedures.

keywords:armour rods machine wikipedia,PLP armor rods installation,pa rod equipments in transmission line,line guard vs armor rod, stockbridge damper manufacture facility

Armor rod single support supplier/preformed suspension clamps for ADSS cable for the installation of cables on the pole/tower.

4. Preformed Armor Rod Stranding 4.1 Technical Requirements Strand lengt 1) Generally speaking, the strand length of the strain clampis equal to two thread pitches. 2)As for the strain camp withsmal thread pith the strandlength depends ondffrenttypes of connection.Itis normalyseveral times as long as the thread pitch of the preformed armor rod. 3) Strand tightness: ight strand by visualispection 4.2 Process5 First the preformed armorod ispositioned andfastened coretly.Nex, markthe postin ofcenter ofthe rod withadevitionof±3mm.Then,swith offand caryout the stranding process.Afterstandingiscompleted,switch on to open the presing plate automaticalyFinaly,take out the preformed armorrod and place it on the rack.

5. Preformed Armor Rod Bending 5.1 Technical Requirements 1) Bending Center Deviation: ±5mm 2) Each end of the rod is perfectly shaped. 3) The preformed armor rod is never compressed or damaged. 4) Parallel loop segments after the shaping process 5.2 Process Place the metalfiting on the bender worktable.The centeline oftension part of thefitig isdirected at tecenterofthemold.Next checkithese twoendsofthe tension par aresymmetricThen,prss thefootswitch and conducta bending processin which the two ends of the metl fiig will b corrected.

 armor rods with color code transmission line and distribution line.aluminum wire, galvanized steel wire, and aluminum clad steel wire material
artisan industry trading nantong company